November 26, 1940
Mr. Wesley Peters
TALIESON
Spring Green, Wisconsin
My dear Mr. Peters:
On sheet No. 1 showing the concrete screen you
indicate that screen is only one half thickness
after rail line. By doing so I am unable to tie the
soreen to the sealing as well as to the lower block.
I wish you would allow mo to build double blocks
so that I could tie the screen onto it;. Furthermore,
advise me if you want me to stop off screen line straight
through sealing line.
In reference to the progress of the building, we
have steam pipes under slab as well as rough flooring poured through the entire building.
Front doors are made as well as balcony doors.
We are waiting for the special hardware. In
other words, the building is closed up. The pulpit is
built with the exception of the marble or pink stone.
We are getting ready to set up the form for the third
bow tie or arch on the east side.
Mr. Berndston was here a couple of weeks ago for
a very brief visit.
With every good wish and hoping to have a prompt
reply, I am
Sincerely yours,
ROBERT. WEHR
RW:ew